Valuing Exotics with Monte Carlo Methods
Valuing Exotics with Monte Carlo Methods
Monte Carlo simulation prices derivatives by simulating thousands of possible price paths, calculating the payoff for each path, and averaging the discounted results. This method handles path-dependent options, multiple underlying assets, and complex payoff structures where closed-form solutions don't exist.
Definition and Key Concepts
Monte Carlo Basics
Monte Carlo pricing:
- Simulate random price paths for underlying(s)
- Calculate option payoff for each path
- Discount payoffs to present value
- Average across all paths
Formula: Option Price = e^(-rT) × (1/N) × Σᵢ Payoff(pathᵢ)
When to Use Monte Carlo
| Use Case | Example |
|---|---|
| Path-dependent options | Asian, lookback, barrier |
| Multiple underlyings | Basket options, worst-of |
| Complex payoffs | Auto-callables, range accruals |
| High dimensions | Correlation products |
| Exotic features | Memory, cliquet, Himalaya |
Comparison to Other Methods
| Method | Strengths | Weaknesses |
|---|---|---|
| Closed-form | Fast, exact | Limited applicability |
| Binomial/Trinomial | Handles early exercise | Slow for high dimensions |
| Finite difference | Accurate Greeks | Complex for path-dependent |
| Monte Carlo | Flexible, handles complexity | Slow, statistical error |
How It Works in Practice
Path Generation
Geometric Brownian Motion: S(t+dt) = S(t) × exp[(r - σ²/2)dt + σ√dt × Z]
Where Z ~ N(0,1) is a standard normal random variable.
Multi-step path (N steps): dt = T/N For each step: generate Z, update S
Example (100 steps for 1-year option):
- Initial S = 100
- r = 5%, σ = 20%
- dt = 1/100 = 0.01
- 10,000 paths simulated
Payoff Calculation
European call: Payoff = max(S_T - K, 0)
Asian call (arithmetic average): Average = (1/N) × Σᵢ S(tᵢ) Payoff = max(Average - K, 0)
Barrier option (down-and-out call): If min(S(tᵢ)) < Barrier: Payoff = 0 Else: Payoff = max(S_T - K, 0)
Variance Reduction
| Technique | Description | Benefit |
|---|---|---|
| Antithetic variates | Use Z and -Z for pairs | Reduces variance 30-50% |
| Control variates | Adjust using known solution | Reduces variance significantly |
| Importance sampling | Oversample important regions | Better for rare events |
| Stratified sampling | Ensure coverage of distribution | More stable estimates |
| Quasi-random numbers | Low-discrepancy sequences | Faster convergence |
Worked Example
Pricing an Asian Option
Option terms:
- Underlying: Stock at $100
- Strike: $100
- Tenor: 1 year
- Averaging: Monthly (12 observations)
- Volatility: 25%
- Risk-free rate: 5%
Monte Carlo setup:
- Paths: 100,000
- Steps per path: 252 (daily)
- Averaging points: 12 (end of each month)
Simulation process:
Path 1:
| Month | Stock Price | Observation |
|---|---|---|
| 1 | $102 | $102 |
| 2 | $98 | $98 |
| 3 | $105 | $105 |
| ... | ... | ... |
| 12 | $115 | $115 |
Average = $104.5 Payoff = max($104.5 - $100, 0) = $4.50
After 100,000 paths:
- Average payoff: $6.25
- Discounted price: $6.25 × e^(-0.05) = $5.94
- Standard error: $0.08
Comparison to vanilla:
- Asian call: $5.94
- Vanilla call: $12.34
- Discount: 52%
Pricing a Barrier Option
Option terms:
- Type: Down-and-out call
- Spot: $100
- Strike: $100
- Barrier: $85
- Tenor: 6 months
- Volatility: 30%
Monte Carlo with 50,000 paths:
| Metric | Value |
|---|---|
| Paths knocked out | 18,500 (37%) |
| Surviving paths avg payoff | $8.20 |
| Expected payoff | 63% × $8.20 = $5.17 |
| Discounted price | $5.04 |
| Vanilla equivalent | $10.50 |
| Barrier discount | 52% |
Multi-Asset Basket Option
Terms:
- 3 stocks: A, B, C
- Weights: Equal (1/3 each)
- Correlations: ρ_AB = 0.6, ρ_AC = 0.4, ρ_BC = 0.5
- Strike: 100% of initial basket
- Type: Call on basket
Correlated path generation:
| Stock | Volatility | Correlation Factors |
|---|---|---|
| A | 25% | Z_A |
| B | 30% | 0.6×Z_A + 0.8×Z_B |
| C | 35% | 0.4×Z_A + 0.3×Z_B + 0.87×Z_C |
Cholesky decomposition generates correlated normals.
Results (100,000 paths):
| Metric | Value |
|---|---|
| Basket call price | $8.75 |
| Sum of individual calls | $12.50 |
| Diversification discount | 30% |
Risks, Limitations, and Tradeoffs
Convergence and Accuracy
| Paths | Standard Error | Confidence Interval (95%) |
|---|---|---|
| 1,000 | 0.50 | ±1.00 |
| 10,000 | 0.16 | ±0.32 |
| 100,000 | 0.05 | ±0.10 |
| 1,000,000 | 0.016 | ±0.032 |
Error decreases as 1/√N — need 4× paths for 2× accuracy.
Computational Considerations
| Factor | Impact |
|---|---|
| Number of paths | Linear in computation time |
| Steps per path | Linear in time |
| Number of assets | Increases complexity |
| Payoff complexity | Adds calculation time |
Typical run times:
- Simple European: Seconds
- Path-dependent: Minutes
- Multi-asset with barriers: Hours
Greek Calculation
Methods for Greeks:
| Method | Description | Accuracy |
|---|---|---|
| Bump and revalue | Shift parameter, reprice | Noisy |
| Pathwise derivatives | Differentiate through paths | Smooth delta |
| Likelihood ratio | Weight paths by parameter | General |
| Adjoint differentiation | Efficient gradient computation | Fast for many inputs |
Bump and revalue example: Delta = [Price(S+ε) - Price(S-ε)] / 2ε
Common Pitfalls
| Pitfall | Description | Prevention |
|---|---|---|
| Too few paths | High variance | Use sufficient paths |
| Wrong time steps | Miss barrier crossings | Finer steps for barriers |
| Correlation errors | Wrong Cholesky decomposition | Verify matrix is positive definite |
| Random seed | Different runs give different answers | Set seed for reproducibility |
| Discretization bias | Continuous barrier vs. discrete | Use barrier correction |
Implementation Considerations
Barrier Correction
Continuous vs. discrete monitoring: Discrete simulation may miss barrier crossings.
Brownian bridge correction: P(cross barrier | S₀, S_T) accounts for continuous path.
Adjustment factor: Barrier_adjusted = Barrier × exp(0.5826 × σ × √dt)
Performance Optimization
| Technique | Benefit |
|---|---|
| Vectorization | 10-100× faster |
| GPU computing | 100-1000× faster |
| Parallel processing | Scales with cores |
| Early termination | Skip after knock-out |
| Caching | Reuse random numbers |
Validation
| Test | Purpose |
|---|---|
| Vanilla benchmark | Compare to closed-form |
| Convergence study | Verify stability with more paths |
| Put-call parity | Check consistency |
| Greek reasonableness | Verify sensible Greeks |
| Limit cases | Check extreme parameters |
Checklist and Next Steps
Model setup checklist:
- Define price dynamics (GBM, local vol, stochastic vol)
- Specify correlation structure
- Choose number of paths and steps
- Select variance reduction techniques
- Implement payoff function
- Set up discounting
Execution checklist:
- Validate against known benchmarks
- Check convergence
- Verify barrier handling
- Compute Greeks
- Document assumptions
Quality assurance:
- Run convergence tests
- Compare to alternative methods
- Stress test parameters
- Review with quant team
- Archive model and results